Redline Trailers

Workshop · iPad shop-floor kiosk

Time Clock

The bit you asked for beyond Damian's build — 8 iPads on the floor. The crew tap their tile and clock onto the trailer they're working, wherever they are. Hours land straight against the build's cost and margin. No paper timesheets, no double entry.

On the clock now

8/8

live

Labour hours today

43.0

across the floor

Floor crew

8

iPad kiosks

Builds being worked

8

right now
Shop-floor kiosk

Tap your tile to clock on

Young NSW workshop · iPad by the roller door

8/8

on the clock

41.8

labour hrs today

WP

Wayne Petersen

Leading Hand / Boilermaker

5:24:00

Running gear fit-up

10×6 Tandem Tipper — 4.5T

DC

Dylan Cross

Fabricator / Welder

5:30:00

Chassis weld-up

8×5 Tandem Tipper — 3.5T

BF

Brad Fenton

Fabricator / Welder

5:18:00

Deck & drop-sides

8×5 Tandem Tipper — 3.5T

MF

Marco Ferretti

Fabricator / Welder

5:36:00

Deck framing (crane float)

Crane / plant float — custom

JW

Jesse Whitlam

Running Gear & Assembly

4:54:00

Running gear + coupling

4WD Off-Road Base 7×4 (camper)

TB

Trent Barlow

Auto Electrician / Wiring

5:12:00

Wiring & LED fit

Flat Top 4.8×2.35 — 900mm

SO

Sam Ottey

Painter / Powder Coat

5:06:00

Powder coat — Hire Orange

Flat Top 4.8×2.35 — hire fleet #1

CN

Cody Nguyen

Apprentice (2nd yr)

4:48:00

LED marker + plate light

The Ultimate 7×4 (cage)

Hours clock straight against each build — feeding its labour cost and the margin you actually make. No paper timesheets, no double entry.

Today's timesheet

Every entry rolls into the build it was booked against — this is what replaces the clipboard.

CrewBuildTaskClock inClock outHours
Wayne Petersen RT-B-2026-0142 Running gear fit-up 07:34 on now live
Dylan Cross RT-B-2026-0141 Chassis weld-up 07:31 on now live
Brad Fenton RT-B-2026-0136 Deck & drop-sides 07:38 on now live
Marco Ferretti RT-B-2026-0140 Deck framing (crane float) 07:29 on now live
Jesse Whitlam RT-B-2026-0137 Running gear + coupling 08:02 on now live
Trent Barlow RT-B-2026-0139 Wiring & LED fit 07:46 on now live
Sam Ottey RT-B-2026-0131 Powder coat — Hire Orange 07:52 on now live
Cody Nguyen RT-B-2026-0135 LED marker + plate light 08:14 on now live
Wayne Petersen RT-B-2026-0142 Chassis alignment 06:58 07:30 0.5
Sam Ottey RT-B-2026-0138 Undercoat prep 07:05 07:48 0.7